Only show results for the year: All 2009 (36) 2008 (136) 2007 (147)
Case Reference Date Issued Recipient's Name Activity/Breach
PN200906-0006 04/06/2009 Edgar Contracts Working at Heights
PN200906-0007 04/06/2009 McIvor Engineering Working at Heights
PN200906-0001 01/06/2009 South Eastern Health & Social Care Trust Operation of the new biomass boiler in the main boiler house at downshire Hospital.
PN200906-0004 28/05/2009 Living Space Construction Work at Heights
PN200906-0010 21/05/2009 James McCullagh Working on roof or at guttering of new dwelling under construction
PN200905-0007 19/05/2009 EMC Building Service Working on a roof without adequate measures to prevent falls from height.
PN200905-0005 06/05/2009 Rodney Hylands Working at heights.
PN200905-0006 06/05/2009 Lee McBride Working at heights.
PN200904-0008 08/04/2009 MARTIN PETER STARRS Operating a tractor and slurry tanker
PN200904-0009 08/04/2009 MARTIN PETER STARRS Operating a tractor and slurry pump.
PN200904-0004 03/04/2009 D A Miller & Sons (Construction) Ltd. Shuttering erection close to vertical excavated embankment
PN200904-0002 31/03/2009 Ciaran Maginess Work at heights
PN200904-0003 31/03/2009 Kieran Digney Work at Heights
PN200904-0001 27/03/2009 Kenny Hull Work at heights.
PN200903-0007 27/03/2009 McGirr Bros The use of inclined conveyor at the washing plant. The possibility of entrapment or crushing in the dangerous parts of the machinery(tail drum & head drum)
PN200904-0005 25/03/2009 Fintan McElroy Contracts demolition of derlict garages and removal of asbestos cement materials
PN200903-0006 18/03/2009 JMG Operation of FLT
PN200903-0005 13/03/2009 East Antrim Property Development Further demolition of partially demolished multi-storey single dwelling. Breach is cited on PN as Reg 5 of Control of Asbestos Regs (N.I.) 2007 - option not listed on drop down menu below.
PN200903-0004 12/03/2009 Johnny McKaigue Working at Heights
PN200903-0003 06/03/2009 James Reid Homes Work at heights
PN200902-0010 23/02/2009 Turlough McNulty Work on roof
PN200902-0007 17/02/2009 John Forsythe Carrying on blast cleaning using a silica -based sand product
PN200902-0008 13/02/2009 John F Linton Work at height on house being built.
PN200902-0009 13/02/2009 MMG Builders Working at height around a chimney with inadequate edge protection
PN200902-0004 09/02/2009 Cox Contracts Working at Height.
PN200902-0005 09/02/2009 M. Construction Ltd WAH without scaffolding or edge protection.
PN200902-0006 09/02/2009 Martin Madine Working at heights without adequate edge protection or scaffolding.
PN200902-0003 04/02/2009 ARC Removal if insulation and other materials from the roofspace of Cedar Villas,Gransha Hospital.Area has been tented and fitted with 3 stage airlock and waste not bagged in accirdance with Method Statement.
PN200902-0001 29/01/2009 Moore Concrete Products Limited Use of a Telescopic mobile crane owned by BCHC LTD, adjacent to 2,75kv power lines. No evidence of a liftingplan or an appointed person available
PN200902-0002 29/01/2009 George Steele Construction Use of a telescopic mobile lifting crane owned by BCHC LTD, on farm ,adjacent to 275 KV power lines.- No lifting plan, No appointed person.
PN200901-0013 28/01/2009 Don McCusker Use of pallet on the forks of JCB Handler to raise two workmen to fix a light outside the premises of French's cafe, Downpatrick St,Rathriland, falling up to 3 metres to ground level.
PN200901-0009 16/01/2009 C R Preston & Son Work at Heights
PN200901-0007 15/01/2009 WHITE LOUGH QUARRIES & CONSTRUCTION LIMITED Work on roof
PN200901-0012 13/01/2009 Joesph Rafter Work at height
PN200901-0003 08/01/2009 McElwaine Joinery Working at Heights
PN200901-0001 06/01/2009 NWP Recycling Ltd Use of the conveyor at 1a Tosagh Roadfactory . NWP Recycling LTD. The possibility of entrapment or crushing in the dangerous parts of the machinery.
PN200812-0013 05/12/2008 Thomas McKeown Working at height (building brickwork) upper floor of semi-detached dwelling, without edge protection
PN200901-0002 04/12/2008 CALDERWOOD GLASS LIMITED Area of car park adjacent to pedestrian access area is contaminated with asbestos material
PN200812-0011 01/12/2008 Brendan Neeson Working without adequate measures to prevent falls from height
PN200812-0012 01/12/2008 J&D Construction LTD Working without adequate measures to prevent falls from height
PN200811-0010 28/11/2008 Devine Power Contracts Demolition clearing works within the building
PN200811-0011 28/11/2008 Devine Power Contracts unplanned demolition works
PN200812-0002 26/11/2008 Higgins Construction (Garvagh) Limited Working on roofs of NIHE bungalows without adequate edge protection
PN200812-0001 26/11/2008 Higgins Construction (Garvagh) Limited Using Barford site dumper on site of NIHE project at Cuilrath St area in Coleraine
PN200901-0005 25/11/2008 LOUGHDOO AGGREGATES The use of the conveyor at the Concrete Batch Mixer
PN200901-0006 25/11/2008 LOUGHDOO AGGREGATES The use of the conveyor from the Primary Feed Hopper to the First Crusher
PN200811-0009 25/11/2008 Michael McVeigh Work on the roof of a 2 storey house
PN200812-0008 21/11/2008 AT Sand & Gravel Limited USE OF CONCRETE SAND CONVEYOR
PN200812-0009 21/11/2008 AT Sand & Gravel Limited Use of fine sand conveyor
PN200812-0010 21/11/2008 AT Sand & Gravel Limited Use of 10mm conveyor
PN200812-0007 19/11/2008 McCAFFREY (CONCRETE PRODUCTS) LIMITED Use of conveyor
PN200812-0014 17/11/2008 NORMAN EMERSON & SONS LIMITED Operating primary crusher conveyor and subsequent conveyors.
PN200901-0004 17/11/2008 Douglas Acheson Ltd The use of the conveyor at the Primary Crusher
PN200812-0005 17/11/2008 Duffy Contracts Ltd All works associated with underground petroleum tanks.
PN200812-0006 17/11/2008 Forecourt Systems All works associated with underground petroleum tanks.
PN200811-0004 07/11/2008 Mark Rea Working on roof of new bungalow (tiling, chimney work etc)
PN200811-0003 05/11/2008 Ramage Contracts WORK AT HEIGHTS
PN200811-0002 05/11/2008 ROSBOTHAM DEMOLITION LIMITED WORK AT HEIGHTS
PN200812-0003 05/11/2008 CAPPER TRADING LIMITED uSE OF CONVEYOR
PN200812-0004 05/11/2008 CAPPER TRADING LIMITED Operation of press brake.
PN200811-0006 04/11/2008 Martin O'Kane Roofing work at an extension to the filling station at 804 Feeney Road, Dungiven, BT47 4TA
PN200810-0010 23/10/2008 John Gale Working on roof of Church building, salvaging old slates prior to building demolition, without adequate edge protection
PN200811-0005 22/10/2008 SAMUEL WILLIAM KNIGHT Work at height from bucket of a telescopic handler
PN200810-0011 21/10/2008 MK Surface Treatment Ltd Paint spraying in the large shed.
PN200810-0009 20/10/2008 McCAFFREY (CONCRETE PRODUCTS) LIMITED All works associated with the construction of the slurry tank
PN200810-0008 20/10/2008 WILLIAM & MRS HAZEL JARDINE Operating a tractor and Kuhn disc mower
PN200810-0007 07/10/2008 Ethel Allen Demolition & removal of Asbestos contaminated material
PN200810-0012 23/09/2008 Stephen Gargan Building Using unprotected stairwell of house to gain access to second and third floor
PN200809-0002 19/09/2008 COOTES (CONCRETE PRODUCTS) LIMITED The use of the feed belt from back hopper
PN200808-0008 14/08/2008 John McArdle Roofing Work at heights
PN200808-0009 14/08/2008 G Small Work at heights.
PN200808-0007 14/08/2008 Killard Contracts Working at heights at 128 Malone Avenue
PN200905-0001 13/08/2008 Woodside Contractors Working at height on floors and roof of block of flats being constructed on site
PN200810-0001 13/08/2008 Cleary Contracting Ltd. WORKING IN TRENCH WITHOUT SUPPORT
PN200905-0004 12/08/2008 Joe Murtagh Working on roof of new bungalow without adequate edge protection
PN200808-0003 06/08/2008 William Adams Work on roof
PN200808-0004 06/08/2008 Gerry McBrian Work on roof
PN200808-0001 31/07/2008 McLaughlin & Harvey Limited Work in an Excavation at site of new Pumpimg station . McLaughlin & Harvey Ltd, 15 Trench Road, Mallusk, Belfast, BT36 4TY FG Wilson ,sewage pumping station , Larne. Potential for the excavation to collapse and the man hole rings to move as they are loaded on one side.
PN200808-0002 31/07/2008 David Jameson Services Working at heights at Downpatrick Telephone Exchange, Church St, Downpatrick. Working without adequate measures to prevent falls from height.
PN200905-0002 23/07/2008 J & T Duddy Working on fragile roof without adequate safety precautions to prevent workers falling through or off edge of roof.
PN200905-0003 23/07/2008 EGLINTON COLD STORES LIMITED Working at height on fragile roof without adequate precautions to prevent falling through or from edge.
PN200904-0016 23/07/2008 James McGillian Sand Blasting internal stone walls of old factory shed.
PN200904-0014 24/06/2008 Jimmy Craig Contol of workmen Working at Height with inadequate safety measures in place.
PN200904-0015 24/06/2008 Anthony Mark Working dangerously at height - poor scaffold, no edge protection on other platforms
PN200904-0013 23/06/2008 N.M. Developments Construction of basement floor and retaining wall adjacent to unsupported excavation at side of live busy road-way.
PN200806-0005 17/06/2008 Emron Construction Work at roof of a 2 storey house
PN200806-0004 16/06/2008 NORTHERN EXCAVATORS LIMITED Use of road rail wagon T16 at NIR Infastructure. Vehicle brakes are not working efficiently.
PN200806-0002 16/06/2008 NORTHERN EXCAVATORS LIMITED Use of Road Rail Vehicle Daewoo Solar 70W-111, at NIR Infastructure. Vehicle brakes are not working properly.
PN200806-0003 16/06/2008 NORTHERN EXCAVATORS LIMITED Use of road rail wagon 7-8 at NIR Infastructure. Vehicle brakes are not working efficiently.
PN200806-0001 09/06/2008 Malachy Trainor Working at Heights. Placing roof trusses without scaffolding.
PN200806-0006 04/06/2008 Prefab Engineering Blast cleaning using silica based sand
PN200811-0008 02/06/2008 Chris McArdle WORK AT HEIGHTS
PN200904-0011 30/05/2008 Sean Jordan Engineering Operation of LVD press brake
PN200807-0002 29/05/2008 SHJ Using portable electric table saw with several safey features missing.
PN200807-0001 29/05/2008 AQUAFORCE LIMITED Carrying on with a building project
PN200809-0001 27/05/2008 OMAGH MINERALS LIMITED Operation of Ogden mobile crusher
PN200805-0011 22/05/2008 Keith Gilmore Working at Heights
PN200811-0007 22/05/2008 Samual Millar WORK AT HEIGHTS
PN200805-0017 21/05/2008 MARTIN MCKINLESS Operating a tractor amd 660l Hardi sprayer
PN200805-0009 21/05/2008 C S Construction Working at Height
PN200805-0012 19/05/2008 Sean Jordan Engineering Use of Ficep saw and drill Line
PN200805-0015 14/05/2008 Boyd Bedding USE OF CONVEYOR TO DROP OUT HOUSE
PN200805-0016 14/05/2008 Boyd Bedding Use of conveyor belt 3 drop out house
PN200805-0013 14/05/2008 Boyd Bedding Use of conveyor from debarker to spill site
PN200805-0014 14/05/2008 Boyd Bedding Use of conveyor below planer
PN200904-0012 14/05/2008 Drumdollagh Construction Company Limited Using steep temporary earth ramps for vehicular access between upper and lower levels, close to excavations, on confined site,
PN200805-0005 06/05/2008 COMPLETE MAINTENANCE SOLUTIONS (NI) LIMITED WAH
PN200805-0006 06/05/2008 Tommy Young WAH
PN200805-0007 06/05/2008 Sean McGavigan WAH
PN200805-0008 06/05/2008 Ivan Downey WAH
PN200805-0004 22/04/2008 PN Shotblasting Carrying on a blast cleaning operationusing silica based sand.
PN200805-0003 07/04/2008 Andrew Kirkpatrick Working at Heights.
PN200805-0002 04/04/2008 John Wilson WAH
PN200804-0025 04/04/2008 Peter Reid WORK AT HEIGHTS
PN200804-0014 04/04/2008 Murray Building Working, at heights, at Stoneyford Road, Stoneyford
PN200805-0001 02/04/2008 M&S Construction WAH
PN200804-0006 27/03/2008 N.I. Shotblasting Ltd Carrying on a blast-cleaning operation using silica-based sand.
PN200804-0007 27/03/2008 ROSS CRAWFORD operating a tractor and single axle Redrock 2000 slurry tanker
PN200804-0008 27/03/2008 ROSS CRAWFORD Operating a tractor and Redrock 2000 twin axle slurry tanker, serial no 24634
PN200804-0009 27/03/2008 ROSS CRAWFORD Operating a tractor and Redrock 200 twin axle slurry tanker
PN200803-0021 27/03/2008 QUINN GROUP LIMITED Placing of hollow-core concrete slabs
PN200804-0003 26/03/2008 ROBERT SAMUEL MCCREA Operating a tractor and 1500 Redrock open top slurry tanker.
PN200804-0004 26/03/2008 SAMUEL RITCHIE operating a tractor and Star 1100 Vacuum lurry tanker.
PN200804-0002 26/03/2008 Gary O'Neill Carrying out any work in relation to a gas fitting or service pipework.
PN200803-0013 21/03/2008 R J Bradley Working at height on new dwelling under construction at 68 Carhill Road, Coleraine
PN200803-0018 19/03/2008 Brian Matchett & Son Working at heights.
PN200803-0019 19/03/2008 Dermot Kealey Working at heights.
PN200804-0024 18/03/2008 Ivor Building Services WORK AT HEIGHTS
PN200803-0017 14/03/2008 Craigavon Borough Council Use of Massey Ferguson 360 tractor which is not in good repair.
PN200803-0016 13/03/2008 Craigavon Borough Council Use of Ford 3600 Tractor due to it being in a poor condition to operate.
PN200803-0014 13/03/2008 North Down Borough Council Use of JCB back actor as compactor without segragation from members of the public.
PN200804-0023 13/03/2008 Belfast Roofing Services WORK AT HEIGHTS
PN200803-0015 13/03/2008 Craigavon Borough Council Use of Bomford Bandit grass cutter without suitably guarded PTO shaft.
PN200803-0012 11/03/2008 Turkington Construction Ltd The construction of a cast in-situ concrete building at Victoria St, Belfast.Collapse of materials & structures endangering the workforce & others
PN200803-0006 05/03/2008 Madden Fuels Filling of propane and butane gas cylinders.
PN200803-0010 05/03/2008 PENROSE ROOFING LIMITED Roof work - work at heights 40A Cantall Road, Mossley,BT36
PN200803-0011 05/03/2008 Andrew Shaw working at heights 40A Cantall Road , Mossley
PN200803-0009 04/03/2008 WILSON & MAWHINNEY LTD Any work activity in the rear yard of 13-15 Bridge St,Lisburn The instability of the rear wall which is approx 7.4 high and has been adversely affected by strong winds.
PN200803-0001 03/03/2008 North West Excavations Work at Heights
PN200802-0050 29/02/2008 CARR BROTHERS LIMITED WORK ON THE ROOF
PN200804-0022 28/02/2008 R Elliott & Sons WORK AT HEIGHTS
PN200803-0005 28/02/2008 Arcon Engineering Demolishing/dismantling old poultry houses until adequate controls are in place to prevent spread of asbestos fibres
PN200804-0021 22/02/2008 AMC Developments WORK AT HEIGHTS
PN200802-0016 21/02/2008 Saun McKenzie work at heights
PN200802-0031 21/02/2008 Jim Hollingsworth & Son Ltd. Work with rubble contaminated with asbestos
PN200803-0004 19/02/2008 K L H QUIGG Operating a tractor and slurry tanker
PN200802-0009 15/02/2008 N. W. Property Developments Working at heights.
PN200802-0010 15/02/2008 Karl Thompson Working at heights.
PN200802-0007 13/02/2008 Caraman Ltd WORK AT HEIGHTS
PN200802-0008 13/02/2008 Seamus Patterson WORK AT HEIGHTS
PN200802-0005 12/02/2008 Eugene Murphy Work on roof
PN200802-0006 12/02/2008 Brian Cassidy Work on roof
PN200803-0007 08/02/2008 DNA Contracts Ltd Work at Heights
PN200803-0008 08/02/2008 Owen Loughrin Work at height
PN200802-0049 08/02/2008 Bell Contracts Exposure to workforce to airborne asbestos fibres
PN200804-0026 04/02/2008 David Christie & Son WORK AT HEIGHTS
PN200802-0003 01/02/2008 Michael Toner WORK AT HEIGHTS
PN200802-0004 01/02/2008 Brendan Toner WORK AT HEIGHTS
PN200802-0002 30/01/2008 Alskea Contracts Working at Heights
PN200801-0016 25/01/2008 PFG Planthire Demolition and associated works.
PN200801-0019 24/01/2008 Michael McElroy Working at Heights
PN200801-0014 23/01/2008 Glen Curry Working at Height
PN200801-0020 23/01/2008 Jim Tummon Work at heights
PN200801-0021 23/01/2008 Harold Scott working at heights without adequate mearures to prevent falls from heights
PN200802-0043 23/01/2008 CHIEFTAIN INSULATION (N.I.) LTD Removal of asbestos residues in a boiler house
PN200801-0012 23/01/2008 Kelly Plant Hire Work within 7m of the excavated face along the Hillsborough Road and within 7m of the adjacent site access road.
PN200801-0013 23/01/2008 Kelly Plant Hire The use of the inclined access road adjacent to the excavated face on the Hillsborough Road.
PN200801-0017 22/01/2008 JOSEPH BARRETT & SONS LIMITED Use of the sand drier plant
PN200801-0018 22/01/2008 JOSEPH BARRETT & SONS LIMITED Use of conveyor from ramp to weigh hopper
PN200801-0010 18/01/2008 CONCRETE FLOORING SYSTEMS LIMITED Work at Heights and in particular, placing of hollow core floor slabs
PN200801-0011 11/01/2008 Lyndale Homes (NI) Ltd Work at Heights
PN200801-0006 07/01/2008 CRAWFORD HOMES (L & G) LTD Working at Heights
PN200802-0047 20/12/2007 EMC Building Service Unsafe Work at Heights
PN200802-0045 17/12/2007 JOHN TURLEY & CO LIMITED Placing of Hollow-Core Floor Slabs
PN200802-0046 17/12/2007 CONCRETE FLOORING SYSTEMS LIMITED Placing of Hollow-Core floor slabs
PN200711-0002 14/12/2007 BOCONNELL PROPERTIES LTD WORK AT HTS
PN200712-0010 13/12/2007 Brendan Curran WAH in particular roofwork
PN200712-0008 12/12/2007 HUGH J O'BOYLE WORK AT HEIGHTS
PN200801-0001 12/12/2007 Metro Homes Working at heights.
PN200801-0007 12/12/2007 Paddy Gallagher Working at heights.
PN200801-0002 12/12/2007 FAUGHANSIDE ENTERPRISES LTD Working at heights.
PN200801-0004 12/12/2007 ECD Builders Ltd Working at heights.
PN200712-0009 11/12/2007 Kevin Watson Construction Ltd Work at height
PN200712-0005 07/12/2007 Bradley Construction work at height
PN200712-0006 07/12/2007 S & L Devine work at height
PN200712-0002 06/12/2007 Glasnevin Developments Limited Work at Height
PN200712-0004 06/12/2007 McManus Construction Work at heights
PN200712-0007 06/12/2007 Winterson Homes Work at heights
PN200802-0037 05/12/2007 SFH Construction Ltd Excavation Work at Depth
PN200712-0012 03/12/2007 Cecil Bloomer Working at heights.
PN200712-0013 03/12/2007 R P R Construction Working at Heights.
PN200712-0014 03/12/2007 Alskea Contracts Working at heights.
PN200712-0001 03/12/2007 John Arnold WAH in particular blockwork and roofwork
PN200712-0011 29/11/2007 P & A Developments Working at Heights.
PN200802-0041 28/11/2007 David Humphreys Carrying out work in relation to a gas fitting or service pipework without CORGI registration at domestic, residential and industrial premises
PN200711-0017 27/11/2007 Austin and Leslie Reid WAH and in particular overhand building and roofwork
PN200711-0016 27/11/2007 John Curran Work at height and in particular overhand building and roofwork
PN200711-0010 21/11/2007 McVeigh Builders Working at heights.
PN200802-0044 12/11/2007 Lagan Developments (Holdings) Limited Demolition of buildings and breaking up of asbestos cement sheets
PN200802-0042 11/11/2007 John Dowds Installation of gas pipework and associated gas fittings at any commercial or domestic premises
PN200711-0009 05/11/2007 J Gourley & Sons The use of the static crusher, screeners and conveyors
PN200711-0007 02/11/2007 Stephen Jordan Working at Heights.
PN200711-0008 02/11/2007 Martin Hamill Construction Working at Heights.
PN200802-0040 02/11/2007 DPC Joinery & Building Work at Heights & Demolition Activities afftecting the front facade
PN200711-0004 01/11/2007 Carl Henry Working at height using Telescopic handler and open pallet to attach cladding.
PN200711-0005 01/11/2007 Paul Martin Permitting contractor to work at height using Telescopic handler and open pallet to attach cladding.
PN200804-0018 31/10/2007 Derek Houston WORK AT HEIGHTS
PN200804-0019 31/10/2007 John McKintry & Sons WORK AT HEIGHTS
PN200711-0006 30/10/2007 Kelly Bros WAH in particular roofwork
PN200711-0013 26/10/2007 MSM Contracts Working at Heights.
PN200711-0014 26/10/2007 RIPLEY DEVELOPMENTS LIMITED Working at Heights.
PN200711-0015 26/10/2007 CONCRETE FLOORING SYSTEMS LIMITED Working at Heights.
PN200804-0005 25/10/2007 Tony Glackin WORK AT HEIGHTS
PN200802-0038 25/10/2007 John McArdle Roofing Work at Heights
PN200802-0039 25/10/2007 Tully & Son Ltd Work at Heights
PN200710-0015 25/10/2007 WM MCLAUGHLIN & SONS LIMITED Operation of primary hopper conveyor at feeder belt.
PN200711-0012 19/10/2007 Peadar O'Byrne Working at heights.
PN200711-0011 18/10/2007 Martin McCann Work at heights
PN200710-0013 17/10/2007 Liam McConvey Work in vacinity of unsupported earth bank following collapse of reatining wall
PN200711-0001 16/10/2007 JOHN TURLEY & CO LIMITED WORK AT HEIGHTS
PN200802-0018 12/10/2007 David Davidson Working at heights.
PN200710-0014 12/10/2007 R & B Roofing Roofwork
PN200710-0011 12/10/2007 North Down Roofing Roofwork
PN200802-0017 11/10/2007 Oaks Developments Working at Heights.
PN200802-0015 10/10/2007 CONCRETE FLOORING SYSTEMS LIMITED Working at heights.
PN200802-0012 10/10/2007 John "Bosco" O'Neill Working at heights.
PN200802-0013 10/10/2007 Patrick McElvogue Working at heights.
PN200802-0014 10/10/2007 Mark McLaughlin Working at heights.
PN200802-0048 02/10/2007 Alastair McHenry Construction Limited Work at Height
PN200709-0014 27/09/2007 AMC WORK AT HEIGHTS
PN200709-0015 27/09/2007 Creagh Concrete Products Limited WORK AT HEIGHTS
PN200804-0012 27/09/2007 G.R. HOMES LIMITED WORK AT HEIGHTS
PN200710-0010 27/09/2007 POLLY BROTHERS WORKING IN TRENCH WITHOUT SUPPORT
PN200710-0002 26/09/2007 TENSIXTYSIX LIMITED WORK AT HEIGHTS
PN200804-0010 19/09/2007 JFM Construction Limited WORK AT HEIGHTS
PN200709-0013 17/09/2007 Joseph Wright Operating a tractor and slurry pump
PN200804-0027 17/09/2007 JOSEPH & DAVID REID Operating a tractor and slurry pump
PN200709-0008 14/09/2007 MBC Ireland Construction of commercial buildings
PN200709-0010 14/09/2007 CONWELL ROOFING CONTRACTS LIMITED Work on Roof
PN200709-0007 13/09/2007 N.I. Shotblasting Ltd Shortblasting of metal fabrications with the sand or silica containing materials
PN200709-0006 12/09/2007 IVOR CORBETT WAH including plstering and Roofwork
PN200710-0012 06/09/2007 Barry Quinn Working at heights.
PN200802-0036 06/09/2007 Pat Rodgers Demolition of a building containing asbestos cement
PN200710-0007 03/09/2007 Creagh Concrete Products Limited Working at heights.
PN200710-0008 03/09/2007 Foyle Plastering Ltd. Work at heights.
PN200801-0009 29/08/2007 John Clarke WORK AT HEIGHTS
PN200709-0003 29/08/2007 WM MCLAUGHLIN & SONS LIMITED The use of the conveyor from the primary hopper tail drum to the cone crusher.
PN200804-0011 29/08/2007 STEPHEN GARGAN WORK AT HEIGHTS
PN200710-0009 24/08/2007 Tony Conway Working at heights.
PN200710-0001 23/08/2007 Rk Construction WORK AT HEIGHTS
PN200711-0003 23/08/2007 JTC WORK AT HEIGHTS
PN200804-0017 23/08/2007 EDMUND C NICHOLL Allowing work on roof of his new house
PN200804-0015 23/08/2007 Tony Conway Working on roof of new house
PN200804-0016 23/08/2007 Ryan Scott Working on roof of house being constructed
PN200709-0005 22/08/2007 Cuan Developments WAH in particular plastering and overhand building
PN200709-0001 20/08/2007 McGaffins Contracts Ltd Steel Work
PN200709-0002 20/08/2007 Alex Morton Contracts Limited Steel Work
PN200709-0016 18/08/2007 Alan D Jamieson-Ewing operating a tractor and Dada slurry pump
PN200708-0015 17/08/2007 ROBERT A & MRS EVELYN JONES Operating a tractor and disc mower.
PN200708-0010 15/08/2007 ANSA Developments Limited Work at Heights
PN200708-0011 15/08/2007 Darren McVeagh Work at heights without any edge protection - building blocks above first floor level without scaffolding
PN200803-0003 15/08/2007 ANSA Developments Limited Work at Heights
PN200710-0004 15/08/2007 Northern Archaeological Consultancy Ltd WORK IN TRENCHES
PN200708-0019 14/08/2007 M J SHAW LIMITED WORK AT HEIGHTS
PN200708-0012 10/08/2007 Creagh Concrete Products Limited Placing of Hollow-core Floor Slabs
PN200708-0013 10/08/2007 QFix Placing of hollow-core floor slabs
PN200708-0014 10/08/2007 HERON BROS. work at heights
PN200710-0003 10/08/2007 Bunting Keenan Plumbing & Heating Carrying out work in relation to a gas fitting or service pipework (gas)
PN200709-0004 09/08/2007 INDEPENDENT FERTILISERS LIMITED Use of the conveyor(s) at the 'blending plant'.
PN200710-0005 08/08/2007 Nigel Grant Working at heights.
PN200708-0018 07/08/2007 Ken Cochrane WORK AT HEIGHTS
PN200802-0035 03/08/2007 D Murphy & Sons Work between earth bank and rear of shuttered wall
PN200708-0005 02/08/2007 McHenry Brothers Ireland WORK AT HEIGHTS
PN200708-0006 02/08/2007 Acravilla Construction WORK AT HEIGHTS
PN200802-0034 02/08/2007 H D McCullough Work at Height including roofing plastering and bricklaying
PN200708-0016 31/07/2007 Martin Curry Roofwork
PN200710-0006 27/07/2007 Lorcen Kelly Working at heights.
PN200708-0001 25/07/2007 Terry Rooney Work at Height
PN200708-0004 24/07/2007 Patton Group Limited WORK AT HEIGHTS
PN200708-0002 24/07/2007 McQuillan Contracts Working at heights.
PN200707-0011 23/07/2007 WM JAMES A FERGUSON Operating a tractor and drum mower.
PN200707-0012 23/07/2007 DENIS CASSIDY OPERATION OF TRACTOR AND DRUM MOWER
PN200802-0033 20/07/2007 MAGHERA DEVELOPMENTS LIMITED Working at height on ground and 1st floor to rear of building and work from aluminium tower scaffold without guard rails
PN200708-0017 20/07/2007 Citytec Services Carrying out any work in relation to a gas fitting or service pipework
PN200708-0003 18/07/2007 T Kerr Construction WORK AT HEIGHTS
PN200707-0004 27/06/2007 G.T. EXHAUSTS (N.I.) LIMITED Operation of Lock Seamer (Code B2-06)
PN200707-0002 27/06/2007 G.T. EXHAUSTS (N.I.) LIMITED Operation of lock seamer
PN200707-0003 27/06/2007 G.T. EXHAUSTS (N.I.) LIMITED Operation of lock seamer (Code B7-06)
PN200707-0001 26/06/2007 Sean Moore Developments Ltd Operation of tower crane outside site boundary with Whaley Terrace
PN200709-0011 26/06/2007 Portora Royal School Swimming in the outdoor pool at Portora Royal School Enniskillen
PN200707-0005 25/06/2007 DAVID ANDREW BEACOM Operation of tractor and slurry tanker
PN200802-0032 21/06/2007 WESTERN BUILDING SYSTEMS LTD working at heights
PN200706-0006 20/06/2007 Seamus Beagan House Building
PN200707-0010 13/06/2007 Woolsey Holdings Limited Placing of concrete floor slabs
PN200707-0009 13/06/2007 MOSS CONSTRUCTION (NI) LIMITED Placing of Concrete Floor Steps
PN200803-0020 13/06/2007 O'Kane & Devine Construction Limited Working at Heights
PN200708-0009 12/06/2007 CLARKE ENGINEERING AND CONSTRUCTION COMPANY LIMITED Working on "live" electrical systems
PN200709-0012 05/06/2007 Sperrin Construction Working at height without adequate safety measures to prevent falls
PN200802-0020 01/06/2007 D.C. Contracts Working at heights.
PN200706-0004 31/05/2007 DPK DEVELOPMENTS LIMITED Construction of reinforced concrete retaining wall
PN200706-0003 29/05/2007 W J Watters block laying at new building at rear of Hall without adequate protection to prevent falls from height.
PN200708-0007 25/05/2007 P.& K. McKaigue Carrying on building on new community building being constucted on Main Street, Cullybackey, Co. Antrim
PN200802-0011 18/05/2007 Abraham Building Contractors Limited Working at heights.
PN200705-0002 17/05/2007 MAGHERA DEVELOPMENTS LIMITED Work At Height including roof work and work at upper floors
PN200802-0028 16/05/2007 Ivan Magowan Shot Blasting without proper adequate containment
PN200705-0001 04/05/2007 Moyard Properties Quarrying activity, excavation or the use of plant or machinery, on the western quarry face over the area highlighted in the attached map.
PN200802-0027 30/04/2007 Princess Way Developments Ltd Removable of Asbestos contaminated rubble
PN200707-0014 26/04/2007 HUGH J O'BOYLE WORK AT HEIGHTS
PN200707-0013 25/04/2007 Northside Demolition WORK AT HEIGHTS
PN200706-0007 24/04/2007 ROSKYLE LIMITED Roof Work & Plastering
PN200802-0021 24/04/2007 Finlay Breton Ltd Working at heights.
PN200704-0013 24/04/2007 Sean Moore Developments Ltd Work on Retaining wall
PN200706-0005 18/04/2007 J A (TONY) CARLIN Operating David Brown 990 tractor in course ot agricultural operations when it is not fitted with an approved safety cab or ROPS.
PN200704-0003 03/04/2007 JOSEPH & ALAN MOORE Operating a tractor and Star 1100 slurry tanker
PN200704-0004 03/04/2007 JOSEPH & ALAN MOORE Operating a tractor and Keenan diet feeder
PN200802-0030 03/04/2007 Craigavon Borough Council operation of "Viper Macon Compactor " without segregation from Members of the Public.
PN200802-0029 03/04/2007 Craigavon Borough Council Operation of machine (Viper Macon Compactor)which is not in good repair
PN200706-0001 02/04/2007 Sloan Construction Work at height - poor scaffold, overhand building etc
PN200706-0002 02/04/2007 Peter McGratton Work at height - poor scaffold, overhand building etc